
AUGUST 2009. The equipment for construction of technical gas production plants was delivered by TIS Group to the final consignee at the free economic area Alabuga. Amoung the equipment carried special attention can be drawn to tanks over 30 m lenght and with 93 tons weight each. During the preparations for the successul shipment of the cargo a thorough servey of the route was carried out. The combined use of sea and road transport was considered the optimal solution. The shipment was made successfully and timely by TIS Group.